Bridge

BIN 1030661

I81 over 80 80 33012176

GoodNYSDOT rating 6.33 of 7Inspected Nov 18, 2024

Download CSV

Inventory facts

Location
Carries
I81
Crosses
80 80 33012176
County
ONONDAGA
NYSDOT region
(3) Syracuse
Place
Tully (Town)
Location note
JCT OF RTS I-81 SB + 80
Ownership
Owner
NYSDOT
Maintained by
NYSDOT
Design
Year built
2016
Structure type
04 - Tee Beam
Material
5 - Prestressed Concrete
Spans
1
Length (ft)
72
Deck area (sq ft)
3096
Condition
NYSDOT condition rating
6.331 (poor) to 7 (new)
FHWA condition
Good
Poor status
NoBridge Conditions dataset
NBI superstructure
70 to 9
Last inspection
2024-11-18
Load and traffic
R-posted
NOPosting flag as recorded
AADT
33479Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Nov 2, 2026.

Contracts that name this BIN 5 in the record-plan index

  • D900023Awarded Jul 17, 20152 structures, including this one
    Interstate 81 Bridges Over Route 80 (Design Build Project)
    I-81 · Onondaga · PIN 3501.56.121 · 209 sheets indexed
  • D254426Awarded Dec 29, 19929 structures, including this one
    VARIOUS SHS.,;BRIDGE CLEANING AND PAINTING OF 9 BRIDGES,;VARIOUS RTS.;
    Onondaga · PIN 3802.52 · 10 sheets indexed
  • D253758Awarded Apr 9, 199116 structures, including this one
    VARIOUS SHS., 35 BRIDGES IN GUIDERAIL ANCHORAGE TESTING CONTRACT, BRIDGE REHAB., VARIOUS RTS. 1010440,1010450,1010460,1010470,1010490,1024911,1024911,1024912,1031341,1031342,1031351,,1031352,1031421,;
    Cortland and others · PIN 3751.51
  • D96067Awarded Jun 29, 197911 structures, including this one
    A.C. RECON. ON RT. I-81; MISC.
    I-81 · Marathon (town), Lapeer (town), Virgil (town), Cortlandville (town), Homer (village), Preble (town), Tully (town) · Cortland and others · PIN 3500.51 · 161 sheets indexed
  • SH 64--05Awarded May 11, 19645 structures, including this one
    C.C.P. CONSTRUCTION,;RT. I-81;
    I-81 · Preble (town), Tully (town) · Cortland and others · 94 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 2, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.