Bridge
BIN 1031212
I81 - Interstate 81 over FULLER ROAD
FairNYSDOT rating 4.84 of 7Inspected Aug 28, 2024
Inventory facts
Location
- Carries
- I81 - Interstate 81
- Crosses
- FULLER ROAD
- County
- BROOME
- NYSDOT region
- (9) Binghamton
- Place
- Chenango (Town)
- Location note
- 3.1 MI N OF N BING CTY LI
Ownership
- Owner
- NYSDOT
- Maintained by
- NYSDOT
Design
- Year built
- 1966
- Structure type
- 02 - Stringer/Multi-Beam or Girder
- Material
- 3 - Steel
- Spans
- 3
- Length (ft)
- 145.1
- Deck area (sq ft)
- 4817
Condition
- NYSDOT condition rating
- 4.841 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- 60 to 9
- Last inspection
- 2024-08-28
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 19712Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Oct 31, 2026.
Contracts that name this BIN 3 in the record-plan index
- Maintenance Bridge Painting of 9 Bridges on Routes 363, and I-81 in the City of Binghamton and Town of ChenangoI-81, NY 363 · Binghamton (city), Dickinson (town), Chenango (town) · Broome · PIN 9804.95
- BRIDGE REPAIRS ON 8 BRIDGES, RT. I-81;I-81 · Dickinson (town), Chenango (town), Binghamton (city) · Broome · PIN 9804.44 · 83 sheets indexed
- C.C.P. CONSTRUCTION,;RT. I-81, C.R. 47, 17; AS BUILTS WERE LOST IN FIRE; RT. I-81I-81, US 11 · Binghamton (city), Dickinson (town), Chenango (town) · Broome · 379 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.