Bridge

BIN 1032300

NY82 over MNRR BEACON LINE

PoorNYSDOT rating 4.14 of 7Inspected Aug 29, 20252 planned projects

Download CSV

Planned and programmed work plans as published, not awarded contracts

  • PIN 801449STIPTitle names BIN 1032300
    ROUTE 82 OVER MNR BRIDGE REMOVAL, HOPEWELL JUNCTION
    Programmed FFY 2026 $1.5M, FFY 2027 $9.3M · Dutchess
  • PIN 801449Capital ProgramSame PIN as the STIP entry that names BIN 1032300
    This project will remove the existing structure that carries Route 82 over the Metro North Rail Line in Hopewell Junction in the Town of East Fishkill in Dutchess County to create an at-grade crossing of Route 82 with the Metro North Railroad service track to the Hopewell Yard. The work will also include the installation of a pedestrian culvert to reroute pedestrian traffic from the Empire State Trail under Route 82 north of the existing bridge location. The project will also replace the existing signalized intersection of Route 82 and Beekman Road with a single lane roundabout to improve safety and operations.
    OTHER · Planned completion Sep 14, 2029
Source: Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026; NYSDOT Capital Program projects. Our copy checked Nov 1, 2026.

Inventory facts

Location
Carries
NY82
Crosses
MNRR BEACON LINE
County
DUTCHESS
NYSDOT region
(8) Poughkeepsie
Place
East Fishkill (Town)
Location note
0.3 MI N JCT SH 82 & SH37
Ownership
Owner
NYSDOT
Maintained by
NYSDOT
Design
Year built
1936
Structure type
03 - Girder and Floorbeam System
Material
3 - Steel
Spans
1
Length (ft)
115
Deck area (sq ft)
3554
Condition
NYSDOT condition rating
4.141 (poor) to 7 (new)
FHWA condition
Poor
Poor status
YesBridge Conditions dataset
NBI superstructure
50 to 9
Last inspection
2025-08-29
Load and traffic
R-posted
NOPosting flag as recorded
AADT
14342Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Nov 1, 2026.

Contracts that name this BIN 0 in the record-plan index

No indexed contracts.

Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.