Bridge
BIN 1032580
Ramp 0I08400844C to Ramp 0I08400844A over 84I 84I84031097
FairNYSDOT rating 4.95 of 7Inspected Sep 10, 20242 planned projects
Planned and programmed work plans as published, not awarded contracts
- INTERSTATE 84 RAMP G BRIDGE REPLACEMENTSProgrammed FFY 2026 $33M · Putnam
- This project will replace the two structures that carry Ramp G of Interstate 84 over Interstate 84 and Interstate 684 in the Town of Southeast in Putnam County. The work may include deck replacement and superstructure replacement, along with widening of the two structures.BRIDGE REHABILITATION OR REPLACEMENT · Contract D265693 · Planned completion Apr 20, 2029
Source: Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026; NYSDOT Capital Program projects. Our copy checked Nov 1, 2026.
Inventory facts
Location
- Carries
- Ramp 0I08400844C to Ramp 0I08400844A
- Crosses
- 84I 84I84031097
- County
- PUTNAM
- NYSDOT region
- (8) Poughkeepsie
- Place
- Southeast (Town)
- Location note
- 0.1 MI W JCT RTS I84+I684
Ownership
- Owner
- NYSDOT
- Maintained by
- NYSDOT
Design
- Year built
- 1967
- Structure type
- 02 - Stringer/Multi-Beam or Girder
- Material
- 3 - Steel
- Spans
- 4
- Length (ft)
- 241
- Deck area (sq ft)
- 6507
Condition
- NYSDOT condition rating
- 4.951 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- 60 to 9
- Last inspection
- 2024-09-10
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 19188Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Nov 1, 2026.
Contracts that name this BIN 6 in the record-plan index
- 4.7 Miles of Asphalt Concrete Overlay on Cracked & Seated Concrete Pavement on I-684 in the Towns of Southeast & North SalemI-684 · Southeast (town), Bedford (town), Lewisboro (town), North Salem (town) · Putnam and others · PIN 8113.54 · 377 sheets indexed
- VARIOUS SHS.,;MAINTENANCE PAINTING OF;14 BRIDGES,;VARIOUS RTS.;I-684, I-84, NY 22, US 202, US 6, US 9 · Southeast (town), Kent (town), Patterson (town), Carmel (town), Brewster (village), Philipstown (town) · Putnam · PIN 8804.17
- A.C. RESURFACING AND BRIDGE REHAB., RT. I-84;I-684, I-84, NY 121, NY 22, US 202, US 6 · Southeast (town), Kent (town), Patterson (town) · Putnam · PIN 8061.97 · 49 sheets indexed
- BRIDGE DECK RECONSTRUCTION ON 4 BRIDGES RAMP A & C OVER THE MAMARONECK RIVER, I-287 & WESTCHESTER AVE. (WB), RAMP G OVER I-84, I-84 (WB) OVER RT, 6,22, 202, THE CROTON RIVER,ARGONNE RD. & CONRAIL;I-684, I-84 · Southeast (town), Patterson (town), Harrison (village), White Plains (city), North Castle (town) · Putnam and others · PIN 8061.36 · 33 sheets indexed
- A.C. RECON.,;RT. I-84, I-684, 981B;I-684, I-84, NY 22, US 202, US 6 · Southeast (town), Patterson (town) · Putnam · 382 sheets indexed
- Pavement Rehabilitation on I-684. Cracking & Seating of PCC Pavement & Asphalt Conc. Overlay, Select Maintenance & Repair of 10 Bridges on I684 & I84 in the Towns of Southeast & North Salem.I-684 · Southeast (town), Bedford (town), Lewisboro (town), North Salem (town) · Putnam and others · PIN 8113.54 · 404 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.