Bridge

BIN 1035360

NY97 over HALFWAY BROOK

FairNYSDOT rating 5.25 of 7Inspected May 12, 2026

Download CSV

Inventory facts

Location
Carries
NY97
Crosses
HALFWAY BROOK
County
SULLIVAN
NYSDOT region
(9) Binghamton
Place
Highland (Town)
Location note
JCT SH 97 & SH 55
Ownership
Owner
NYSDOT
Maintained by
NYSDOT
Design
Year built
1931
Structure type
23 - I-Beam or Bulb Tee
Material
1 - Concrete
Spans
1
Length (ft)
50
Deck area (sq ft)
2190
Condition
NYSDOT condition rating
5.251 (poor) to 7 (new)
FHWA condition
Fair
Poor status
NoBridge Conditions dataset
NBI superstructure
50 to 9
Last inspection
2026-05-12
Last inspection (Bridge Conditions)
2024-05-06
Load and traffic
R-posted
NOPosting flag as recorded
AADT
1179Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Oct 31, 2026.

Contracts that name this BIN 2 in the record-plan index

  • D500092Awarded Jan 29, 19852 structures, including this one
    BRIDGE RAIL REPLACEMENT AT 2 LOCATION ON RT. 97 AND FRANCIS ST.;
    I-81, I-86, NY 17, NY 97 · Kirkwood (town), Binghamton (city), Lumberland (town), Highland (town) · Broome and others · PIN 9801.47 · 11 sheets indexed
  • RC 3254Awarded Aug 11, 1930
    A.C. RECON.;
    NY 97 · Lumberland (town), Highland (town) · Sullivan · 27 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.