Bridge
BIN 1035360
NY97 over HALFWAY BROOK
FairNYSDOT rating 5.25 of 7Inspected May 12, 2026
Inventory facts
Location
- Carries
- NY97
- Crosses
- HALFWAY BROOK
- County
- SULLIVAN
- NYSDOT region
- (9) Binghamton
- Place
- Highland (Town)
- Location note
- JCT SH 97 & SH 55
Ownership
- Owner
- NYSDOT
- Maintained by
- NYSDOT
Design
- Year built
- 1931
- Structure type
- 23 - I-Beam or Bulb Tee
- Material
- 1 - Concrete
- Spans
- 1
- Length (ft)
- 50
- Deck area (sq ft)
- 2190
Condition
- NYSDOT condition rating
- 5.251 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- 50 to 9
- Last inspection
- 2026-05-12
- Last inspection (Bridge Conditions)
- 2024-05-06
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 1179Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Oct 31, 2026.
Contracts that name this BIN 2 in the record-plan index
- BRIDGE RAIL REPLACEMENT AT 2 LOCATION ON RT. 97 AND FRANCIS ST.;I-81, I-86, NY 17, NY 97 · Kirkwood (town), Binghamton (city), Lumberland (town), Highland (town) · Broome and others · PIN 9801.47 · 11 sheets indexed
- RC 3254Awarded Aug 11, 1930A.C. RECON.;NY 97 · Lumberland (town), Highland (town) · Sullivan · 27 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.