Bridge

BIN 1043190

NY248 over WOODWARD CREEK

FairNYSDOT rating 6.28 of 7Inspected Oct 10, 2024

Download CSV

Inventory facts

Location
Carries
NY248
Crosses
WOODWARD CREEK
County
STEUBEN
NYSDOT region
(6) Hornell
Place
Greenwood (Town)
Location note
0.9 MI N OF GREENWOOD
Ownership
Owner
NYSDOT
Maintained by
NYSDOT
Design
Year built
1961
Structure type
02 - Stringer/Multi-Beam or Girder
Material
3 - Steel
Spans
1
Length (ft)
68
Deck area (sq ft)
2550
Condition
NYSDOT condition rating
6.281 (poor) to 7 (new)
FHWA condition
Fair
Poor status
NoBridge Conditions dataset
NBI superstructure
60 to 9
Last inspection
2024-10-10
Load and traffic
R-posted
NOPosting flag as recorded
AADT
1387Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Oct 31, 2026.

Contracts that name this BIN 4 in the record-plan index

  • D260730Awarded Mar 31, 2008
    Bridge Rehab. on Rt. 248 over Woodward Creek(composite girder) in the Town of Greenwood.
    NY 248 · West Union (town), Greenwood (town) · Steuben · PIN 6056.28 · 50 sheets indexed
  • D254091Awarded Apr 21, 19925 structures, including this one
    BRIDGE REHAB. ON 5 BRIDGES,;RT. 21, 248, 371;
    NY 21, NY 248, NY 371 · Wayland (village), Cohocton (town), West Union (town), Greenwood (town), Canisteo (town) · Allegany and others · PIN 6084.27 · 84 sheets indexed
  • D251937Awarded Aug 25, 19864 structures, including this one
    STONTE FILLING BRIDGE-CHANNEL PROTECTION AT 3 LOCATIONS;
    I-99, NY 248 · Lindley (town), Erwin (town), West Union (town), Greenwood (town) · Steuben · PIN M604.00 · 6 sheets indexed
  • RC 60-015Awarded Apr 1, 19603 structures, including this one
    A.C. RECON.;
    NY 248 · West Union (town), Greenwood (town), Canisteo (town) · Steuben · 43 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.