Bridge
BIN 1048221
NY415 over CUTLER CREEK
FairNYSDOT rating 5.33 of 7Inspected Jun 18, 20262 planned projects
Planned and programmed work plans as published, not awarded contracts
- NY 415 MBC PAVING, SIDEWALK & DRAINAGE REPAIRS, STEUBEN COProgrammed FFY 2026 $150k, FFY 2027 $150k, FFY 2028 $1.6M · Steuben
- A project to perform pavement and drainage system repairs on NY 415 from the west side of the Hart Street intersection to the east side of BIN1048221 in the Village of Riverside in Steuben CountyCorrective Maint · Planned completion Nov 15, 2028
Source: Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026; NYSDOT Capital Program projects. Our copy checked Nov 1, 2026.
Inventory facts
Location
- Carries
- NY415
- Crosses
- CUTLER CREEK
- County
- STEUBEN
- NYSDOT region
- (6) Hornell
- Place
- Riverside (Village)
- Location note
- 0.9 MI SE OF PAINTED POST
Ownership
- Owner
- NYSDOT
- Maintained by
- NYSDOT
Design
- Year built
- 1940
- Structure type
- 19 - Culvert
- Material
- 1 - Concrete
- Spans
- 2
- Length (ft)
- 68
- Deck area (sq ft)
- 4080
Condition
- NYSDOT condition rating
- 5.331 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- N0 to 9
- Last inspection
- 2026-06-18
- Last inspection (Bridge Conditions)
- 2024-07-11
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 8511Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Nov 1, 2026.
Contracts that name this BIN 0 in the record-plan index
No indexed contracts.
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.