Bridge

BIN 1070071

I390 over 253 253 43011065

PoorNYSDOT rating 4.89 of 7Inspected Nov 5, 2025

Download CSV

Inventory facts

Location
Carries
I390
Crosses
253 253 43011065
County
MONROE
NYSDOT region
(4) Rochester
Place
Henrietta (Town)
Location note
0.5 miles East or SR15
Ownership
Owner
NYSDOT
Maintained by
NYSDOT
Design
Year built
1980
Structure type
02 - Stringer/Multi-Beam or Girder
Material
3 - Steel
Spans
3
Length (ft)
166
Deck area (sq ft)
10458
Condition
NYSDOT condition rating
4.891 (poor) to 7 (new)
FHWA condition
Poor
Poor status
YesBridge Conditions dataset
NBI superstructure
60 to 9
Last inspection
2025-11-05
Load and traffic
R-posted
NOPosting flag as recorded
AADT
35026Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Nov 1, 2026.

Contracts that name this BIN 6 in the record-plan index

  • D264912Awarded Dec 16, 202210 structures, including this one
    BRIDGE REHABILITATION/ REPLACEMENT: Ten Bridges Throughout Monroe County
    NY 104, I-490, NY 252, NY 15, I-390, NY 253, NY 65 · Irondequoit (town), Rochester (city), Henrietta (town), Honeoye Falls (village) · Monroe · PIN 4806.65 · 155 sheets indexed
  • D264595Awarded Dec 2, 202114 structures, including this one
    BRIDGE PAINTING 2021 MONROE COUNTY
    Gates (town), Henrietta (town), Rush (town), Webster (town), Rochester (city), Churchville (village) · Monroe · PIN 4806.68 · 108 sheets indexed
  • D260230Awarded May 25, 20066 structures, including this one
    Bridge Joint Replacements on Six Bridges Along RT. I-390
    I-390 · Henrietta (town) · Monroe · PIN 4805.09
  • D256229Awarded Aug 26, 19949 structures, including this one
    VARIOUS SHS.,;BRIDGE BEARING REPLACEMENT,;9 BRIDGES,;RT. I-390;
    I-390 · Monroe · PIN 4802.76 · 59 sheets indexed
  • D253254Awarded Apr 30, 19908 structures, including this one
    Bridge Cleaning and Painting of 15 Bridges on Route I-390, 15, 251; 1070531,1070532,1062480,1062501,1062502,1062510,1025869;
    I-390, NY 15, NY 251 · Monroe · PIN 4M89.15
  • D95646Awarded Nov 9, 197712 structures, including this one
    A.C. CONSTRUCTION ON RT. I-390, TOLL FACILITY RELOCATION, CONSTRUCT 9 BRIDGES; COMPOSITE GIRDER, PRESTRESSED CONC. BOX BEAM
    I-390 · Henrietta (town) · Monroe · PIN 4182 · 339 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.