Bridge
BIN 5030279
I90 - NYS Thruway over TRANSIT RD
FairNYSDOT rating 4.79 of 7Inspected Jun 3, 2026
Inventory facts
Location
- Carries
- I90 - NYS Thruway
- Crosses
- TRANSIT RD
- County
- ERIE
- NYSDOT region
- (5) Buffalo
- Place
- Cheektowaga (Town)
- Location note
- JCT RT 78 + I-90
Ownership
- Owner
- NYS Thruway Authority
- Maintained by
- NYS Thruway Authority
Design
- Year built
- 1954
- Structure type
- 02 - Stringer/Multi-Beam or Girder
- Material
- 3 - Steel
- Spans
- 3
- Length (ft)
- 162
- Deck area (sq ft)
- 20250
Condition
- NYSDOT condition rating
- 4.791 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- 60 to 9
- Last inspection
- 2026-06-03
- Last inspection (Bridge Conditions)
- 2024-06-24
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 46877Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Nov 2, 2026.
Contracts that name this BIN 2 in the record-plan index
- RC 75-029Awarded Mar 21, 1975SAFETY IMPROVEMENTS,;RT. 324, 78;NY 78 · Clarence (town) · Erie · PIN 5209.11 · 31 sheets indexed
- C.C.P. CONSTRUCTION,;RT. I-90;Erie · 35 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 2, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.