Bridge

BIN 5203039

I90 - NYS Thruway over GREGG ROAD

FairNYSDOT rating 5.49 of 7Inspected Sep 11, 2025

Download CSV

Inventory facts

Location
Carries
I90 - NYS Thruway
Crosses
GREGG ROAD
County
SCHENECTADY
NYSDOT region
(1) Albany
Place
Rotterdam (Town)
Location note
1.1 MI NW INT 26 ON I90
Ownership
Owner
NYS Thruway Authority
Maintained by
NYS Thruway Authority
Design
Year built
1955
Structure type
01 - Slab
Material
1 - Concrete
Spans
1
Length (ft)
39
Deck area (sq ft)
4407
Condition
NYSDOT condition rating
5.491 (poor) to 7 (new)
FHWA condition
Fair
Poor status
NoBridge Conditions dataset
NBI superstructure
70 to 9
Last inspection
2025-09-11
Load and traffic
R-posted
NOPosting flag as recorded
AADT
31456Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Nov 1, 2026.

Contracts that name this BIN 1 in the record-plan index

  • MT 52-18Awarded Jan 31, 19534 structures, including this one
    C.C.P. CONSTRUCTION,;RT. I-90, MONTGOMERY CO LINE TO GREGG RD.;
    NY 160 · Duanesburg (town), Princetown (town), Rotterdam (town) · Schenectady · 160 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.