Bridge
BIN 5510552
I90 - NYS Thruway over GENESEE RIVER
FairNYSDOT rating 5.90 of 7Inspected Sep 22, 2025
Inventory facts
Location
- Carries
- I90 - NYS Thruway
- Crosses
- GENESEE RIVER
- County
- MONROE
- NYSDOT region
- (4) Rochester
- Place
- Chili (Town)
- Location note
- 3.9 MI W OF EXIT 46 90I
Ownership
- Owner
- NYS Thruway Authority
- Maintained by
- NYS Thruway Authority
Design
- Year built
- 1952
- Structure type
- 02 - Stringer/Multi-Beam or Girder
- Material
- 4 - Steel (Continuous)
- Spans
- 3
- Length (ft)
- 304
- Deck area (sq ft)
- 17146
Condition
- NYSDOT condition rating
- 5.91 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- 70 to 9
- Last inspection
- 2025-09-22
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 29199Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Oct 31, 2026.
Contracts that name this BIN 1 in the record-plan index
- C.C.P. CONSTRUCTION,;RT. I-90;NY 252, NY 383 · Chili (town), Scottsville (village), Wheatland (town) · Monroe · 143 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.