Bridge
BIN 5516049
I90 - NYS Thruway over EXIT 30 RAMP
FairNYSDOT rating 4.73 of 7Inspected May 16, 2025
Inventory facts
Location
- Carries
- I90 - NYS Thruway
- Crosses
- EXIT 30 RAMP
- County
- HERKIMER
- NYSDOT region
- (2) Utica
- Place
- Herkimer (Village)
- Location note
- 0.2 MI EAST OF INTERSECTI
Ownership
- Owner
- NYS Thruway Authority
- Maintained by
- NYS Thruway Authority
Design
- Year built
- 1955
- Structure type
- 02 - Stringer/Multi-Beam or Girder
- Material
- 3 - Steel
- Spans
- 1
- Length (ft)
- 50.6
- Deck area (sq ft)
- 6325
Condition
- NYSDOT condition rating
- 4.731 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- 60 to 9
- Last inspection
- 2025-05-16
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 20847Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Nov 2, 2026.
Contracts that name this BIN 1 in the record-plan index
- C.C.P. CONSTRUCTION,;RT. I-90;NY 167, NY 28, NY 5S · Little Falls (town), Herkimer (village), Mohawk (village), German Flatts (town) · Herkimer · 355 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 2, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.