Bridge
BIN 5516861
I90 - NYS Thruway WB over CR 4
FairNYSDOT rating 4.00 of 7Inspected May 5, 2025
Inventory facts
Location
- Carries
- I90 - NYS Thruway WB
- Crosses
- CR 4
- County
- GENESEE
- NYSDOT region
- (4) Rochester
- Place
- Pembroke (Town)
- Location note
- 0.5 MI SW JCT RTE 5&I90
Ownership
- Owner
- NYS Thruway Authority
- Maintained by
- NYS Thruway Authority
Design
- Year built
- 1954
- Structure type
- 19 - Culvert
- Material
- 1 - Concrete
- Spans
- 1
- Length (ft)
- 35
- Deck area (sq ft)
- 2205
Condition
- NYSDOT condition rating
- 41 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- N0 to 9
- Last inspection
- 2025-05-05
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 42297Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Nov 2, 2026.
Contracts that name this BIN 1 in the record-plan index
- C.C.P. CONSTRUCTION,;RT. I-90, COUNTY LINE TO SLUSSER RD.;NY 77 · Pembroke (town), Alabama (town) · Genesee · 106 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 2, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.