Bridge
BIN 552015C
I190 NB to Elm St over EXCHANGE ST
FairNYSDOT rating 5.33 of 7Inspected Oct 18, 2025
Inventory facts
Location
- Carries
- I190 NB to Elm St
- Crosses
- EXCHANGE ST
- County
- ERIE
- NYSDOT region
- (5) Buffalo
- Place
- Buffalo (City)
- Location note
- EXIT N6 OF I190
Ownership
- Owner
- NYS Thruway Authority
- Maintained by
- NYS Thruway Authority
Design
- Year built
- 1960
- Structure type
- 02 - Stringer/Multi-Beam or Girder
- Material
- 3 - Steel
- Spans
- 9
- Length (ft)
- 572
- Deck area (sq ft)
- 21336
Condition
- NYSDOT condition rating
- 5.331 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- 80 to 9
- Last inspection
- 2025-10-18
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 12864Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Oct 31, 2026.
Contracts that name this BIN 1 in the record-plan index
- C.C.P. CONSTRUCTION & DRAIN OUTLET,;KENSINGTON EXPRESSWAY & NTC;Erie · 224 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.