Contract
CT 53-11
C.C.P. CONSTRUCTION;
Record-plan index
- Award date
- Sep 8, 1953
- PIN
- Not recorded
- County
- Orange
- Places
- Hamptonburgh (town), New Windsor (town), Newburgh (town), Highland Falls (village), Highlands (town), Woodbury (village), Cornwall (town), Chester (town), Blooming Grove (town)
- NYSDOT region
- 8 Poughkeepsie
- Sheets indexed
- 539As-built scanned: Yes · As-let: No
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 2, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Structures named 12 found in the structure layers
| BIN | Carries / crosses | County | Owner | Built | Condition |
|---|---|---|---|---|---|
| 5520049 Bridge | I87 NB to 984C WB over METRO NORTH RR | Orange | NYS Thruway Authority | 1953 | Fair |
| 5514349 Bridge | I87 - NYS Thruway over ABAND. RR (NY ONT AND WEST) | Orange | NYS Thruway Authority | 1953 | Fair |
| 5514320 Bridge | PLEASANT HILL R over 87IX | Orange | NYS Thruway Authority | 1953 | Fair |
| 5514319 Bridge | I87 - NYS Thruway over MOODNA CREEK | Orange | NYS Thruway Authority | 1953 | Fair |
| 5514300 Bridge | TAYLOR RD over 87IX | Orange | NYS Thruway Authority | 1953 | Fair |
| 5514299 Bridge | I87 - NYS Thruway over WOODBURY CREEK | Orange | NYS Thruway Authority | 1953 | Good |
| 5514280 Bridge | PINE HILL RD over 87IX | Orange | NYS Thruway Authority | 1953 | Poor |
| 5514269 Bridge | I87 NB to 984C WB over 87IX | Orange | NYS Thruway Authority | 1953 | Fair |
| 5040519 Bridge | I87 - NYS Thruway over NYS 207 | Orange | NYS Thruway Authority | 2021 | Good |
| 5034919 Bridge | I87 - NYS Thruway over NY-94 | Orange | NYS Thruway Authority | 1953 | Fair |
| 5022229 Bridge | I87 - NYS Thruway over 32 32 83011048 | Orange | NYS Thruway Authority | 1954 | Poor |
| 5003370 Bridge | ESTRADA ROAD over 87IX | Orange | NYS Thruway Authority | 1953 | Fair |
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 2, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.