Contract
D252168
SUPERSTRUCTURE REPLACEMENT ON RT. 202, BRIDGE OVER EAST BRANCH OF CROTON RIVER; COMPOSITE GIRDER BRIDGE, APPROACH RECON.
Record-plan index
- Award date
- Jul 10, 1987
- PIN
- 8480.15
- County
- Westchester
- Places
- Somers (town), North Salem (town)
- NYSDOT region
- 8 Poughkeepsie
- Sheets indexed
- 62As-built scanned: Yes · As-let: No
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Structures named 1 found in the structure layers
| BIN | Carries / crosses | County | Owner | Built | Condition |
|---|---|---|---|---|---|
| 1036190 Bridge | US202 over EAST BRANCH CROTON RIVER | Westchester | NYSDOT | 1928 | Poor |
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 1, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.