Contract

D263598

Route 9 and Taconic State Parkway; Rustic Guide Rail and Culvert Rail Replacement (16.6 miles).

Download CSV

Record-plan index

Award date
Jan 12, 2018
Route
US 9
Places
Philipstown (town)
NYSDOT region
8 Poughkeepsie
Sheets indexed
42As-built scanned: Yes · As-let: Yes
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.

Structures named 0 found in the structure layers

No structures.

Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 1, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.