Contract
D95875
C.C.P. CONSTRUCTION OF RT. I-88;7 BRIDGES; CONTINUOUS COMPOSITE BEAM
Record-plan index
- Award date
- Sep 14, 1978
- PIN
- 1357.03
- Route
- I-88
- County
- Schenectady
- Places
- Princetown (town)
- NYSDOT region
- 1 Albany
- Sheets indexed
- 241As-built scanned: Yes · As-let: Yes
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Structures named 6 found in the structure layers
| BIN | Carries / crosses | County | Owner | Built | Condition |
|---|---|---|---|---|---|
| 1070671 Bridge | I88 over UNNAMED STREAM | Schenectady | NYSDOT | 1978 | Fair |
| 1070672 Bridge | I88 - Senator Warren M. Anderson Expressway over UNNAMED STREAM | Schenectady | NYSDOT | 1980 | Fair |
| 1070641 Bridge | I88 over NORMANS KILL | Schenectady | NYSDOT | 1980 | Good |
| 1070642 Bridge | I88 - Senator Warren M. Anderson Expressway over NORMANS KILL | Schenectady | NYSDOT | 1980 | Good |
| 1070661 Bridge | I88 over 7 7 1605 1126 | Schenectady | NYSDOT | 1980 | Good |
| 1070662 Bridge | I88 - Senator Warren M. Anderson Expressway over 7 7 1605 1126 | Schenectady | NYSDOT | 1980 | Fair |
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 1, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.