Contract
MT 53-03
C.C.P. CONSTRUCTION,;RT. I-90, GORDON RD. TO ALBANY CO. LINE;
Record-plan index
- Award date
- Apr 7, 1953
- PIN
- Not recorded
- County
- Albany, Schenectady
- Places
- Schenectady (city), Princetown (town), Rotterdam (town)
- NYSDOT region
- 1 Albany
- Sheets indexed
- 221As-built scanned: Yes · As-let: No
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 2, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Structures named 3 found in the structure layers
| BIN | Carries / crosses | County | Owner | Built | Condition |
|---|---|---|---|---|---|
| 5513720 Bridge | GORDON RD over 90IX | Schenectady | NYS Thruway Authority | 1993 | Fair |
| 5513700 Bridge | I90 - NYS Thruway over POENTIC KILL | Schenectady | NYS Thruway Authority | 1955 | Good |
| 5513680 Bridge | DUNNSVILLE RD over 90IX | Schenectady | NYS Thruway Authority | 1993 | Poor |
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 2, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.