Contract
SH 63--13
C.C.P. CONSTRUCTION,;WASHINGTON AVE. EXT.; RT. 910D
Record-plan index
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 2, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Structures named 7 found in the structure layers
| BIN | Carries / crosses | County | Owner | Built | Condition |
|---|---|---|---|---|---|
| 1093140 Bridge | WASHINGTON AVE over ACCESS ROAD B | Albany | State - Other | 1963 | Fair |
| 1093151 Bridge | OGS-CAMPUS RING RD CONN over WASHINGTON AVE | Albany | State - Other | 1963 | Fair |
| 1093152 Bridge | OGS-CAMPUS RING RD CONN over WASHINGTON AVE | Albany | State - Other | 1963 | Fair |
| 1093160 Bridge | WASHINGTON AVE over CAMPUS-I90 CONN. | Albany | State - Other | 1963 | Fair |
| 1093170 Bridge | OGS-CAMPUS OUTER RING RD over CAMPUS I-90 CONN | Albany | State - Other | 1963 | Fair |
| 1093180 Bridge | WASHINGTON AVE over ACCESS ROAD B | Albany | State - Other | 1963 | Fair |
| 1093209 Bridge | 910D - Washington Ave Ext over 910F910F11011005 | Albany | NYSDOT | 1968 | Fair |
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 2, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.