Project

PIN 076221

LIDO BOULEVARD SIDEWALK AND PEDESTRIAN IMPROVEMENT

Statewide Transportation Improvement Program programmed, not awarded

DESIGN AND CONSTRUCT APPROXIMATELY 2.7 MILES OF NEW SIDEWALK AND A 12-FOOT WIDE NON-MOTORIZED PATHWAY WHILE IMPLEMENTING TRAFFIC CALMING THROUGH THE LIDO BOULEVARD CORRIDOR FROM BLACKHEATH RD TO LOOP PARKWAY. CURRENTLY, THE SCOPE OF WORK INCLUDES COMPLETE DETAILED DESIGN AND CONSTRUCTION OF SIDEWALKS, A 12-FOOT-WIDE NON-MOTORIZED PATHWAY ROAD STRIPING, NEW CURBS, AND DRAINAGE IMPROVEMENTS. THE PROPOSED IMPROVEMENTS WILL PROVIDE NEW INFRASTRUCTURE AND SIGNAGE TO IMPROVE ACCESS TO PEDESTRIANS, CYCLISTS, AND THE DIFFERENTLY-ABLED COMMUNITY, HELPING TO BETTER CONNECT THEM TO EXISTING AND PLANNED MULTI-USE TRAILS AND BIKE PATHS IN LONG BEACH, EAST ATLANTIC BEACH, AND ATLANTIC BEACH. ADDITIONALLY, THE PROPOSED LANE DIET WILL REDUCE THE FLOW OF VEHICULAR TRAFFIC, PROMOTING A SAFER CORRIDOR FOR NON-MOTORIZED TRAVELERS IN THE TOWN OF HEMPSTEAD, NASSAU COUNTY. FFY2022 TAP SOLICITATION AWARD

Programmed
FFY 2027: $16MTotal $16M in the listed years
Federal share
$5.0M
Agency
NASSAU COUNTY
Planning organization
N/STCC
County
Nassau
Fund types
LOCAL, TAP LG URBAN
Source: Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Oct 31, 2026. FFY is the federal fiscal year column in the dataset.