Project
PIN 104094
BRIDGE OVER TROUT BROOK;AND OVER OVERFLOW, BRIDGE REHAB.;AND REPLACE., RT. 9 (PRECAST CONCRETE BOX);
Structures named in the project title or its contracts
Contracts in the record-plan index with this PIN 1
- BRIDGE OVER TROUT BROOK;AND OVER OVERFLOW, BRIDGE REHAB.;AND REPLACE., RT. 9 (PRECAST CONCRETE BOX);US 9 · Chester (town) · Warren · PIN 1040.94 · 56 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 2, 2026.