Project
PIN 104364
RT 9/I-87 EXIT 13 SAFETY PROJECT
Statewide Transportation Improvement Program programmed, not awarded
RT 9/I-87 EXIT 13 SAFETY PROJECT THE PORTION OF ROUTE 9 NORTHBOUND IN SARATOGA COUNTY BETWEEN I-87 EXIT 13 SB OFF RAMP (RM 9 1509 1152) AND OLD POST ROAD/CHERRY CHOKE (RM 9 1509 1154) HAS BEEN AN AREA OF REOCCURRING CRASHES AND CONGESTION DUE TO THE HEAVY VOLUME AND CLOSE PROXIMITY OF THE SB EXIT RAMP TO THE TRAFFIC SIGNAL. A PREVIOUS PROJECT LENGTHENED THE ROUTE 9 NB LEFT TURN LANE AT THE SIGNALIZED INTERSECTION. THE CURRENT PLAN IS REALIGNMENT OF THE EXISTING I-87 SB RAMP TO A TEE WITH US ROUTE 9 AND STOP CONDITION. SA366 THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER
- Programmed
- FFY 2026: $56k, FFY 2028: $660kTotal $716k in the listed years
- Federal share
- $644k
- Agency
- NYSDOT
- Planning organization
- CRTC
- County
- Saratoga
- Fund types
- HSIP, SDF
Source: Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Oct 31, 2026. FFY is the federal fiscal year column in the dataset.
Capital Program
- Re-align the existing Interstate 87 Exit 13 southbound ramp to a tee with US Route 9. Town of Malta, Saratoga County.SAFETY · Let by NYSDOT · Planned construction completion Sep 23, 2027
Source: NYSDOT Capital Program projects. Our copy checked Oct 31, 2026.
Structures named in the project title or its contracts
No structures.