Project
PIN 459019
I-390 / I-590 Milling and Resurfacing (5.8 miles)(sidewalks, curbs and guide rail on Monroe Ave ), in Brighton and Rochester.
Structures named in the project title or its contracts
| BIN | Carries / crosses | County | Owner | Built | Condition |
|---|---|---|---|---|---|
| 4443861 Bridge | I390 - Rochester Outer Loop over ERIE CANAL | Monroe | NYSDOT | 1978 | Fair |
| 4443862 Bridge | I390 over ERIE CANAL | Monroe | NYSDOT | 1978 | Poor |
| 1070930 Bridge | I590 - Rochester Outer Loop over SOUTH CLINTON AVENUE | Monroe | NYSDOT | 1981 | Fair |
| 1070940 Bridge | I390 - Rochester Outer Loop over 590I590I43011002 | Monroe | NYSDOT | 1981 | Fair |
| 1070950 Bridge | I590 over 390I390I43031133 | Monroe | NYSDOT | 1981 | Fair |
| 1070881 Bridge | I590 over SOUTH WINTON ROAD | Monroe | NYSDOT | 1981 | Fair |
| 1070882 Bridge | I590 - Rochester Outer Loop over SOUTH WINTON ROAD | Monroe | NYSDOT | 1981 | Fair |
| 1021661 Bridge | I590 over 31 31 43033019 | Monroe | NYSDOT | 1966 | Poor |
| 1021662 Bridge | I590 - Rochester Outer Loop over 31 31 43033019 | Monroe | NYSDOT | 1966 | Poor |
| 1025951 Bridge | I590 over ALLENS CK RD | Monroe | NYSDOT | 1966 | Fair |
| 1025952 Bridge | I590 - Rochester Outer Loop over ALLENS CK RD | Monroe | NYSDOT | 1966 | Fair |
| 1074070 Bridge | Ramp A to NY590 over 590I590I43012005 | Monroe | NYSDOT | 1990 | Fair |
Contracts in the record-plan index with this PIN 1
- I-390 / I-590 Milling and Resurfacing (5.8 miles)(sidewalks, curbs and guide rail on Monroe Ave ), in Brighton and Rochester.I-390, I-490, I-590, NY 31 · Brighton (town), Rochester (city), Pittsford (town) · Monroe · PIN 4590.19 · 94 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026.