PIN 582525

TRACKBED REPLACEMENT - MOHAWK ST. TO EAGLE ST. - DESIGN

Statewide Transportation Improvement Program programmed, not awarded

PROJECT IS FOR DESIGN THAT WILL ADDRESS TRACKBED THAT HAS DETERIORATED AND HAS EXCEEDED ITS USEFUL LIFE. THE INSTALLATION OF A NEW CROSSOVER IN THIS AREA WILL REDUCE HEADWAY TIMES WHEN SINGLE TRACKING IS REQUIRED. THE SCOPE OF WORK FOR THIS PROJECT IS TO REPLACE TRACKBED (TRACKS 1 AND 2), RAILS, AND DRAINAGE FOR THE AREA FROM COURT STREET (SOUTH SIDE) TO CHURCH STREET (NORTH SIDE). THE NEW CROSSOVER WILL BE LOCATED NORTH OF EAGLE STREET ON A FOUNDATION PREVIOUSLY INSTALLED WHEN THE RAIL SYSTEM WAS CONSTRUCTED. BALANCE REMAINING $320K

Programmed
FFY 2026: $320kTotal $320k in the listed years
Agency
NFTA
Planning organization
GBNRTC
County
Erie
Fund types
STATE
Source: Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Oct 31, 2026. FFY is the federal fiscal year column in the dataset.
PIN 582525 · TRACKBED REPLACEMENT - MOHAWK ST. TO EAGLE ST. - DESIGN · NYSDOT Data