Project
PIN 603203
A.C. RECONSTRUCTION OF A PORTION OF THRUSTON-CAMPBELL, PT. 2 AND PAINTED POST-CAMPBELL, BRIDGE REPLACEMENT OF 3 BRIDGES, RT. 333; COMPOSITE STEEL GRIDGER, PRESTRESSED CONCRETE BEAM
Structures named in the project title or its contracts
Contracts in the record-plan index with this PIN 1
- A.C. RECONSTRUCTION OF A PORTION OF THRUSTON-CAMPBELL, PT. 2 AND PAINTED POST-CAMPBELL, BRIDGE REPLACEMENT OF 3 BRIDGES, RT. 333; COMPOSITE STEEL GRIDGER, PRESTRESSED CONCRETE BEAMNY 415 · Painted Post (village), Erwin (town) · Steuben · PIN 6032.03 · 123 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026.