Project

PIN 881488

This project will replace the existing lighting system in the Route 9D Breakneck Tunnel in the Town of Philipstown in Putnam County and the Town of Fishkill in Dutchess County. The project will also include resurfacing of the travel lanes and shoulders through the tunnel, concrete tunnel lining, and pedestrian improvements as well as shoulder reconstruction and widening. Coordination will be necessary with Central Hudson Gas & Electric to mitigate a transmission line within the existing drainage system.

Capital Program

  • This project will replace the existing lighting system in the Route 9D Breakneck Tunnel in the Town of Philipstown in Putnam County and the Town of Fishkill in Dutchess County. The project will also include resurfacing of the travel lanes and shoulders through the tunnel, concrete tunnel lining, and pedestrian improvements as well as shoulder reconstruction and widening. Coordination will be necessary with Central Hudson Gas & Electric to mitigate a transmission line within the existing drainage system.
    Renewal · Let by NYSDOT · Planned construction completion Oct 13, 2025
Source: NYSDOT Capital Program projects. Our copy checked Oct 31, 2026.

Structures named in the project title or its contracts

BINCarries / crossesCountyOwnerBuiltCondition
1006330
Bridge
NY9D
over 9D 9D84021103
PutnamNYSDOT1932Fair

Contracts in the record-plan index with this PIN 1

  • D265238Awarded Jun 3, 2024
    TUNNEL LIGHTING SYSTEM REPLACEMENT - Route 9D, Towns of Fishkill & Philipstown. C830031
    NY 9D · Fishkill (town), Philipstown (town) · Dutchess and others · PIN 8814.88 · 81 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026.