This project will repair or replace storm water catch basins to ensure that the drainage system functions as originally designed. The work will take place in various municipalities along Routes 52, 9W, 59/306, 6/9, 117, 983F, and 981M in Dutchess, Ulster, Orange, Rockland, and Westchester Counties. This project will also include basin cleaning, restoration of pavement around the excavation/basin locations, and curb replacements as needed.

Capital Program

  • This project will repair or replace storm water catch basins to ensure that the drainage system functions as originally designed. The work will take place in various municipalities along Routes 52, 9W, 59/306, 6/9, 117, 983F, and 981M in Dutchess, Ulster, Orange, Rockland, and Westchester Counties. This project will also include basin cleaning, restoration of pavement around the excavation/basin locations, and curb replacements as needed.
    PAVEMENT PRESERVATION · Let by NYSDOT · Planned construction completion Nov 24, 2028
Source: NYSDOT Capital Program projects. Our copy checked Oct 31, 2026.

Structures named in the project title or its contracts

No structures.