Project

PIN T8041297

3 AV - 138 ST / PEL

Statewide Transportation Improvement Program programmed, not awarded

STRUCTURAL REPAIRS OF COLUMNS, BEAMS, COLUMN BASE, AND COMPREHENSIVE STATION PAINTING; REPAIR/REPLACEMENT OF STATION STAIRS.FLOOD RESILIENCY UPGRADES: WATER INFILTRATION PREVENTION ELEMENTS; MODIFICATIONS TO EXISTING VENT BAY STRUCTURE; REMOVAL/RELOCATION OF FLASH FLOOD MECHANICAL CLOSURE DEVICES (FFMCDS); CONSTRUCTION OF A STORMWATER DETENTION SYSTEM AND TRACK PUMPING SYSTEM UPGRADE; INSTALLATION OF NEW SEWER CONNECTION WITH PRESSURE RELIEF MANHOLES AND STORMWATER RETENTION SYSTEM IN THE BOROUGH OF BRONX AT 3AV-138 ST, PELHAM

Programmed
FFY 2026: $97MTotal $97M in the listed years
Federal share
$16M
Agency
MTA NYCT
Planning organization
NYCTCC
County
Bronx
Fund types
FTA 5337, MTA
Source: Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Oct 31, 2026. FFY is the federal fiscal year column in the dataset.