PIN T8080325
CBTC FULTON LINE AND 7 INTERLOCKINGS
Statewide Transportation Improvement Program programmed, not awarded
\\\\\\\'REPLACEMENT OF THE EXISTING FIXED-BLOCK, RELAY-BASED SIGNAL SYSTEM ON NYCT\\\\\\\'S FULTON LINE WITH A TRAIN CONTROL SYSTEM (TCS) BASED ON COMMUNICATION BASED TRAIN CONTROL (CBTC) THAT CAN RELIABLY OPERATE UNDER MTA\\\\\\\'S SIGNALING REQUIREMENTS AND INTEROPERABILITY INTERFACE SPECIFICATIONS (I2S). THE DESIGN-BUILDER IS ALSO REQUIRED TO PROVIDE PHYSICAL ROOMS OR ENCLOSURES IN STATIONS ON THE FULTON LINE TO CREATE TRAIN CONTROL ROOMS (TCRS) IN WHICH THE TCS EQUIPMENT SUPPLIED BY THE DESIGN-BUILDER SHALL BE INSTALLED AND OPERATED IN SUPPORT OF THE TCS. TRACKWORK SHALL INCLUDE THE INSTALLATION OF: A) ONE (1) TANGENTIAL #8 DOUBLE CROSSOVER B) TWO (2) TANGENTIAL #8 SINGLE CROSSOVERS C) TWO (2) TANGENTIAL #6 SINGLE CROSSOVERS D) ONE (1) SPECIAL EQUILATERAL TURNOUT NEW TIES AND TIE BLOCKS. NEW STEEL PLATES WITH SPRING CLIPS
- Programmed
- FFY 2026: $2007MTotal $2007M in the listed years
- Agency
- MTA NYCT
- Planning organization
- NYCTCC
- County
- Queens
- Fund types
- MTA