NEW YORK TRANSPORTATION RESEARCHExplore the public record.
Find highway record plans, contract history and structure facts. Public sources, connected in one place. No account needed to research.
Bridge inventoryBIN 4002312
- Carried feature
- NY8
- Crossed feature
- ERIE BARGE CANAL
- County
- ONEIDA
- NYSDOT region
- (2) Utica
- Owner
- NYSDOT
- Maintainer
- NYSDOT
- Year built
- 1988
- Structure type
- 02 - Stringer/Multi-Beam or Girder
- Material
- B - Unpainted Steel (Continuous)
- Spans
- 3
- Bridge length (ft)
- 382
- Deck area (sq ft)
- 16984
- NYSDOT condition rating (1–7 scale)
- 5.438
- NBI superstructure rating (0–9 scale)
- 6
- FHWA condition status
- Fair
- Posting flag (RPosted, as recorded)
- NO
- AADT (count year not supplied here)
- 16421
- Last inspection date
- 2024-09-10
- Poor status (Bridge Conditions dataset, Y/N)
- N
- Last inspection (Bridge Conditions dataset)
- 2024-09-10
NYSDOT structure source ↗NYSDOT · ONEIDAIndexed record
Bridge Rehabilitation on Rt. 5, 8, 12 and I-790 in the Towns of New Hartford and City of Utica;
- PIN
- 2804.27
- Award date
- 2006-02-09
- Route
- 921C;I790;NY12;NY5;NY5S;NY8;
- Municipality
- Utica (city)
- As-built sheets (index count)
- 42
This contract references multiple structures. Verify which drawings apply to your site.
NYSDOT · ONEIDAIndexed record
RECON. ON NORTH-SOUTH ARTERIAL (RT. 8 AND RT. I-790, 6 BRIDGES REHAB.; A.C. AND C.C.P., BRIDGE REHAB.
- PIN
- 2378.13
- Award date
- 1984-12-04
- Route
- I790;NY12;NY5;NY8;
- Municipality
- Utica; T_Deerfield; T_Marcy (city)
- As-built sheets (index count)
- 575
This contract references multiple structures. Verify which drawings apply to your site.