Bridge
BIN 1056759
908C - Loop Pkwy over REYNOLDS CHANNEL
FairNYSDOT rating 5.22 of 7Inspected Mar 23, 2026
Inventory facts
Location
- Carries
- 908C - Loop Pkwy
- Crosses
- REYNOLDS CHANNEL
- County
- NASSAU
- NYSDOT region
- (10) Hauppauge
- Place
- Hempstead (Town)
- Location note
- NEAR EAST BAY IN NASSAU
Ownership
- Owner
- NYSDOT
- Maintained by
- NYSDOT
Design
- Year built
- 1934
- Structure type
- 06 - Box Beam or Box Girder - Single or Spread
- Material
- 5 - Prestressed Concrete
- Spans
- 20
- Length (ft)
- 642
- Deck area (sq ft)
- 38006
Condition
- NYSDOT condition rating
- 5.221 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- 60 to 9
- Last inspection
- 2026-03-23
- Last inspection (Bridge Conditions)
- 2024-02-07
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 28129Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Nov 1, 2026.
Contracts that name this BIN 7 in the record-plan index
- BRIDGE REHAB - Loop Pkwy Over Reynolds Channel, Meadowbrook State Pkwy over False & Fundy Channel in the Town of Hempstead.Hempstead (town) · Nassau · PIN 0810.51 · 106 sheets indexed
- Minor Bridge Repairs to 5 Bridges in Hempstead Harbor.Nassau · PIN 0808.29 · 40 sheets indexed
- BRIDGE REPAIRS, LP, MSP, HSP, NSP, RT. 25, 27A;I-495, NY 135, NY 25, NY 27A · Oyster Bay (town), Islip (town), Islandia (village), Brookhaven (town), Southold (town), Greenport (village), Babylon (town) · Nassau and others · PIN 0805.46 · 39 sheets indexed
- D254601Awarded May 4, 1993BRIDGE OVER REYNOLDS CHANNEL,;BRIDGE REHAB.,;RT. 908-C;Hempstead (town) · Nassau · PIN 0431.10 · 12 sheets indexed
- D500061Awarded Jan 11, 1985BRIDGE REHAB. AND APPROACHES OF LOOP PARKWAY BRIDGE OVER REYNOLDS CHANNEL;Hempstead (town) · Nassau · PIN 0431.06 · 92 sheets indexed
- VARIOUS LONG ISLAND PARKWAYS; BRIDGE PIERS PROTECTION ON 9 BRIDGESNassau and others · PIN 0801.51 · 12 sheets indexed
- BRIDGE CONSTRUCTION OF MP1, MP2, MP3, LP1, LP2, LP3, SLOOP CHANNEL, LONG CREEK CHANNEL, HIGH FLATS DRAIN, FUNDY CREEK, REYNOLDS CHANNEL, SWIFT CREEK;Nassau · 14 sheets indexed
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.