Bridge
BIN 109254C
Ramp B to Ramp D over VACANT LAND
FairNYSDOT rating 5.23 of 7Inspected Apr 21, 2026
Inventory facts
Location
- Carries
- Ramp B to Ramp D
- Crosses
- VACANT LAND
- County
- ALBANY
- NYSDOT region
- (1) Albany
- Place
- Albany (City)
- Location note
- 0.35 Miles NE of Intersec
Ownership
- Owner
- NYSDOT
- Maintained by
- NYSDOT
Design
- Year built
- 1971
- Structure type
- 02 - Stringer/Multi-Beam or Girder
- Material
- 3 - Steel
- Spans
- 1
- Length (ft)
- 138
- Deck area (sq ft)
- 5382
Condition
- NYSDOT condition rating
- 5.231 (poor) to 7 (new)
- FHWA condition
- Fair
- Poor status
- NoBridge Conditions dataset
- NBI superstructure
- 60 to 9
- Last inspection
- 2026-04-21
- Last inspection (Bridge Conditions)
- 2024-04-11
Load and traffic
- R-posted
- NOPosting flag as recorded
- AADT
- 3837Count year not supplied by this layer
Source: NYSDOT Bridges; Bridge Conditions, NYS Department of Transportation, updated Oct 5, 2026. Our copy checked Oct 31, 2026.
Contracts that name this BIN 4 in the record-plan index
- BRIDGE REHABILITATION SPECIFIC WORK SFY 25- Various Routes, City of Albany, Town of Colonie and Duanesburg.US 20, NY 7, NY 378, I-787, I-90 · Albany (city), Colonie (town), Duanesburg (town) · Albany and others · PIN 1812.13 · 84 sheets indexed
- BRIDGE REHABS.,;RTS. 9, 377 & I-90;I-90, US 9 · Albany (city), Colonie (town) · Albany · PIN 1040.98 · 164 sheets indexed
- BRIDGE PAINTING OF 5 BRIDGES,;RT. I-90;US 9 · Albany (city) · Albany · PIN 1043.25
- BRIDGE PAINTING & MAINTENANCE,;RT. 9 & I-90;(PRIME THE PUMP);I-90, US 9 · Albany (city), Colonie (town) · Albany · PIN 1043.07
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. A BIN named in a contract's index row does not prove every drawing applies to this structure.