Contract

D041680

The project is intended to replace, upgrade (particularly ADA compliance) and/or expand the existing sidewalk network along NY Route 5. Several sidewalk gaps currently exist that will be completed, and additional safety features are proposed for alternative modes of transportation, signage for cyclists, buses, and horse-drawn vehicles.

Capital Program

Route
Not recorded
County
Not recorded

This contract is not in the record-plan index yet (the index lags recent work). It is named by a Capital Program project below.

Source: NYSDOT Capital Program projects. Our copy checked Oct 31, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.

Program listings matched by contract number or PIN

  • PIN 265063Capital ProgramNames this contract
    The project is intended to replace, upgrade (particularly ADA compliance) and/or expand the existing sidewalk network along NY Route 5. Several sidewalk gaps currently exist that will be completed, and additional safety features are proposed for alternative modes of transportation, signage for cyclists, buses, and horse-drawn vehicles.
    PAVEMENT RECONSTRUCTION · Contract D041680 · Planned completion Apr 24, 2029
  • PIN 265063STIPSame PIN
    2023 CRP: VILLAGE OF NELLISTON ACCESSIBLE COMMUNITIES
    Programmed FFY 2027 $210k, FFY 2028 $1.8M · Montgomery
Source: NYSDOT Capital Program projects; Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Oct 31, 2026.

Structures named 0 found in the structure layers

No structures.

Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Oct 31, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.