Contract
D264984
STORM DRAINAGE IMPROVEMENT: NY Rtes. 25 and 27 in the Towns East Hampton, Riverhead, Southampton & Southold.
Record-plan index
- Award date
- Aug 8, 2023
- County
- Suffolk
- NYSDOT region
- 10 Hauppauge
- Sheets indexed
- 212As-built scanned: No · As-let: Yes
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 2, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Program listings matched by contract number or PIN
- This proposed project will help improve the structural integrity of drainage structures to better control flooding on roadways at the following locations: 1. NY25 (Middle Country Road) west of Edwards Avenue in the Town of Riverhead, Suffolk County 2. NY25 (West Main Street) 1.5 miles east of Interstate 495 (Long Island Expressway) Exit 72 in the Town of Riverhead, Suffolk County 3. NY25 (Main Road) at Lands End Road in the Town of Southold, Suffolk County 4. NY27 (Montauk Highway) from Scuttle Hole Road to Mecox Road in the Town of Southampton, Suffolk County 5. NY27 (Montauk Highway) from Sayres Path to Skimhampton Road in the Town of East Hampton, Suffolk County 6. NY27 (Montauk Highway) at Fort Pond in the Town of East Hampton, Suffolk CountyPAVEMENT RECONSTRUCTION · Contract D264984 · Planned completion Apr 30, 2026
Source: NYSDOT Capital Program projects; Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Nov 2, 2026.
Structures named 0 found in the structure layers
No structures.
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 2, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.