Contract
D265297
RECONSTRUCTION - NY Route 17 @ Exit 122, Contract 2.
Record-plan index
- Award date
- Not recorded
- Route
- NY 17
- County
- Orange
- Places
- Walkill (town)
- NYSDOT region
- 8 Poughkeepsie
- Sheets indexed
- 168As-built scanned: No · As-let: Yes
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Program listings matched by contract number or PIN
- This interchange reconstruction project is the second phase of a project to increase safety and mobility on NYS Route 17 in proximity to the interchange with Crystal Run Road, East Main Street. The project will complete the reconstruction of the Exit 122 interchange to meet interstate standards for design, as the entirety of Route 17 is designated to be converted to Interstate 86. Work includes new ramps on the Westbound side of Route 17 to Crystal Run Road and to Interstate 84 Eastbound, and to improve the ramp from Crystal Run Road to Route 17 Eastbound. Work will also include pedestrian improvements including a shared use path along Crystal run road, the widening of the NY Route 17 over the Wallkill River bridge, and signal improvements where necessary. This project is located in the Town of Wallkill in Orange County.OTHER · Contract D265297 · Planned completion Jan 8, 2027
Source: NYSDOT Capital Program projects; Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Oct 31, 2026.
Structures named 0 found in the structure layers
No structures.
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Oct 31, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.