Contract

D265417

PAVEMENT REHABILITATION RT 67: Rt 5 to Rt 10 ST JOHNSVILLE & EPHRATAH

Download CSV

Record-plan index

Award date
Apr 11, 2025
Places
St. Johnsville (town), Ephratah (town)
NYSDOT region
2 Utica
Sheets indexed
57As-built scanned: No · As-let: Yes
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.

Program listings matched by contract number or PIN

  • PIN 218814Capital ProgramNames this contract
    This project will rehabilitate 6.0 miles of NYS Route 67 from Route 5 to Route 10 in the Towns of St Johnsville and Palatine in Montgomery County, and the Town of Ephratah in Fulton County. The project will also address the guiderail, signs, and drainage within the project limits.
    Rehabilitation · Contract D265417 · Planned completion Dec 31, 2025
Source: NYSDOT Capital Program projects; Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Nov 1, 2026.

Structures named 0 found in the structure layers

No structures.

Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 1, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.