Contract
D265685
CRACK SEALING & JOINT OVERLAY REPAIRS - I495 Exit 48 to Exit 64 Towns of Huntington, Smithtown, Islip and Brookhaven
Record-plan index
- Award date
- Mar 20, 2026
- County
- Suffolk
- NYSDOT region
- 10 Hauppauge
- Sheets indexed
- 75As-built scanned: No · As-let: Yes
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Program listings matched by contract number or PIN
- This project proposes to apply a preventative maintenance treatment to seal cracks and apply joint overlays in the pavement. This work will help to maintain and extend the life of the pavement surface and keep the highway system in a state of good repair. 1. Interstate 495 (Long Island Expressway) eastbound and westbound between Exit 48 (Round Swamp Road) to Exit 64 (NY 112) in the Towns of Huntington, Islip, Smithtown and Brookhaven, Suffolk County. 2. Interstate 495 (Long Island Expressway) westbound Commercial Vehicle Inspection Station in the Town of Huntington, Suffolk County. 3. Long Island Expressway North Service Road and South Service Road from Commack Road to Wicks Road in the Towns of Islip and Smithtown , Suffolk County.Preventative Maint · Contract D265685 · Planned completion Mar 31, 2028
- I495 CRACK SEALING EXIT 48 TO EXIT 64Programmed FFY 2026 $5.8M · Suffolk
Source: NYSDOT Capital Program projects; Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Oct 31, 2026.
Structures named 0 found in the structure layers
No structures.
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Oct 31, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.