Contract
D265733
PAVEMENT RESURFACING - NY Route 24 from 908E to NY Route 110 in the Towns of Babylon, Hempstead & Oyster Bay.
Record-plan index
- Award date
- May 5, 2026
- Route
- NY 24
- Places
- Babylon (town), Hempstead (town), Oyster Bay (town)
- NYSDOT region
- 10 Hauppauge
- Sheets indexed
- 0As-built scanned: Yes · As-let: No
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Program listings matched by contract number or PIN
- This project proposes to restore the pavement riding surface to a smooth and distress free condition on NY24 (Hempstead Turnpike) from Meadowbrook Parkway to NY110 (Broad Hollow Road) in the Towns of Hempstead, Oyster Bay, and Babylon, Nassau and Suffolk Counties by milling and resurfacing the existing pavement. All proposed pavement work is expected to increase safety and provide a smooth riding surface for vehicular travel for the next 10 to 12 years.Corrective Maint · Contract D265733 · Planned completion Dec 31, 2026
- NY24 ASPHALT PAVEMENT RESURFACINGProgrammed FFY 2026 $21M · Nassau
Source: NYSDOT Capital Program projects; Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Oct 31, 2026.
Structures named 0 found in the structure layers
No structures.
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Oct 31, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.