Contract
D265810
This project micromills the existing Novachip overlay, repairs concrete slabs and installs a new asphalt top course along Route 201. Additional work includes the installation of new guide railing/median barrier, new signs, curb ramps and pavement markings. Village of Johnson City, Town of Union, Broome County.
Capital Program
- PIN
- 904508
- Route
- Not recorded
- County
- Not recorded
This contract is not in the record-plan index yet (the index lags recent work). It is named by a Capital Program project below.
Source: NYSDOT Capital Program projects. Our copy checked Nov 2, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Program listings matched by contract number or PIN
- This project micromills the existing Novachip overlay, repairs concrete slabs and installs a new asphalt top course along Route 201. Additional work includes the installation of new guide railing/median barrier, new signs, curb ramps and pavement markings. Village of Johnson City, Town of Union, Broome County.Corrective Maint · Contract D265810 · Planned completion Mar 13, 2027
- RT 201 RESURFACING, FLYOVER TO HARRY L DRIVEProgrammed FFY 2026 $6.0M · Broome
- RT 201 RESURFACING, FLYOVER TO HARRY L DRIVEProgrammed FFY 2026 $8.2M · Broome
Source: NYSDOT Capital Program projects; Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Nov 2, 2026.
Structures named 0 found in the structure layers
No structures.
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 2, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.