Contract

D900059

This project will replace two Bronx River Parkway (BRP) bridges (one bridge over East Tremont Ave and a second bridge over E. 180th St./Morris Park Ave/MTA rail yard) and make safety and mobility improvements between East Tremont Ave and Bronx Park (BINS 1067099 and 1067109) in Bronx Co. Additionally, a new bridge will be constructed to extend the interim lane of exiting traffic from S/B BRP to E. 177th St. (to be built under X11028) from E. Tremont Ave to Morris Park Ave. The project also includes wider standard lanes and shoulders, improvements to vertical and horizontal geometry, queuing storage space for exiting traffic, new stormwater drainage facilities, improvements to the safety of NYCDPR's Bronx River Greenway (BRG) and site drainage at the Ranaqua facility, and a shared use path from Bronx River Ave to the BRG in Bronx Park.

Capital Program

Route
Not recorded
County
Not recorded

This contract is not in the record-plan index yet (the index lags recent work). It is named by a Capital Program project below.

Source: NYSDOT Capital Program projects. Our copy checked Nov 1, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.

Program listings matched by contract number or PIN

  • PIN X11029Capital ProgramNames this contract
    This project will replace two Bronx River Parkway (BRP) bridges (one bridge over East Tremont Ave and a second bridge over E. 180th St./Morris Park Ave/MTA rail yard) and make safety and mobility improvements between East Tremont Ave and Bronx Park (BINS 1067099 and 1067109) in Bronx Co. Additionally, a new bridge will be constructed to extend the interim lane of exiting traffic from S/B BRP to E. 177th St. (to be built under X11028) from E. Tremont Ave to Morris Park Ave. The project also includes wider standard lanes and shoulders, improvements to vertical and horizontal geometry, queuing storage space for exiting traffic, new stormwater drainage facilities, improvements to the safety of NYCDPR's Bronx River Greenway (BRG) and site drainage at the Ranaqua facility, and a shared use path from Bronx River Ave to the BRG in Bronx Park.
    BRIDGE REHABILITATION OR REPLACEMENT · Contract D900059 · Planned completion Jul 24, 2028
Source: NYSDOT Capital Program projects; Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Nov 1, 2026.

Structures named 0 found in the structure layers

No structures.

Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 1, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.