THIS PROJECT WILL RESURFACE 11.76 MILES ON ROUTE 30 FROM KICKERVILLE ROAD TO FRANKLIN COUNTY LINE, TOWN OF LONG LAKE, HAMILTON COUNTY. THE PROJECT WILL ALSO INCLUDE THE REPLACEMENT OF GUIDERAIL AND SIGNS. THE BRIDGE RAIL AT THE BRIDGE CARRYING NYS ROUTE 30 OVER THE SALMON RIVER WILL BE REPLACED. THE CULVERT RAIL CARRYING NYS ROUTE 30 OVER THE MUD POND OUTLET WILL BE REPLACED.

Capital Program

  • THIS PROJECT WILL RESURFACE 11.76 MILES ON ROUTE 30 FROM KICKERVILLE ROAD TO FRANKLIN COUNTY LINE, TOWN OF LONG LAKE, HAMILTON COUNTY. THE PROJECT WILL ALSO INCLUDE THE REPLACEMENT OF GUIDERAIL AND SIGNS. THE BRIDGE RAIL AT THE BRIDGE CARRYING NYS ROUTE 30 OVER THE SALMON RIVER WILL BE REPLACED. THE CULVERT RAIL CARRYING NYS ROUTE 30 OVER THE MUD POND OUTLET WILL BE REPLACED.
    Rehabilitation · Let by NYSDOT · Planned construction completion Dec 31, 2025