Contract

D265465

PAVEMENT PRENVENTATIVE MAINTENANCE RT 30 LONG LAKE TO FRANKLIN CO. LINE

Download CSV

Record-plan index

Award date
May 2, 2025
Route
NY 30
County
Hamilton
NYSDOT region
2 Utica
Sheets indexed
47As-built scanned: No · As-let: Yes
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Oct 31, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.

Program listings matched by contract number or PIN

  • PIN 204490Capital ProgramNames this contract
    THIS PROJECT WILL RESURFACE 11.76 MILES ON ROUTE 30 FROM KICKERVILLE ROAD TO FRANKLIN COUNTY LINE, TOWN OF LONG LAKE, HAMILTON COUNTY. THE PROJECT WILL ALSO INCLUDE THE REPLACEMENT OF GUIDERAIL AND SIGNS. THE BRIDGE RAIL AT THE BRIDGE CARRYING NYS ROUTE 30 OVER THE SALMON RIVER WILL BE REPLACED. THE CULVERT RAIL CARRYING NYS ROUTE 30 OVER THE MUD POND OUTLET WILL BE REPLACED.
    Rehabilitation · Contract D265465 · Planned completion Dec 31, 2025
Source: NYSDOT Capital Program projects; Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Oct 31, 2026.

Structures named 0 found in the structure layers

No structures.

Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Oct 31, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.