PIN 280653
This project is a pavement rehabilitation project within the Town and Village of New Hartford. Project limits are along Genesee Street (NYS Route 921E) from the intersection with NYS Route 12 to the village line, and, along Campion Road, Oxford Road, and Mill Street (NYS Route 921T) from the New Hartford Shopping Center driveway to the connection with NYS Route 8 Southbound. This 1.7-mile pavement rehabilitation project will be completed using a 2 inch micromill with a 2 inch overlay. Traffic signals and pedestrian facilities within the project limits will be improved. Roadside safety elements will be addressed including guiderail, drainage, and signs. The objective of this project is to improve the pavement ride quality and safety of the roadway.
Capital Program
- This project is a pavement rehabilitation project within the Town and Village of New Hartford. Project limits are along Genesee Street (NYS Route 921E) from the intersection with NYS Route 12 to the village line, and, along Campion Road, Oxford Road, and Mill Street (NYS Route 921T) from the New Hartford Shopping Center driveway to the connection with NYS Route 8 Southbound. This 1.7-mile pavement rehabilitation project will be completed using a 2 inch micromill with a 2 inch overlay. Traffic signals and pedestrian facilities within the project limits will be improved. Roadside safety elements will be addressed including guiderail, drainage, and signs. The objective of this project is to improve the pavement ride quality and safety of the roadway.Rehabilitation · Let by NYSDOT · Planned construction completion Oct 10, 2025
Structures named in the project title or its contracts
No structures.
Contracts in the record-plan index with this PIN 1
- D264929Awarded Mar 1, 2023921E and 921T Paving ProjectNY 921E, NY 921T · New Hartford (town), New Hartford (village), Utica (city) · Oneida · PIN 2806.53 · 184 sheets indexed