Contract
D264929
921E and 921T Paving Project
Record-plan index
Source: NYSDOT Highway Record Plans, updated Jun 26, 2026. Our copy checked Nov 1, 2026. Scan flags are index metadata, not a file listing: files can exist when they say no, and the reverse.
Program listings matched by contract number or PIN
- This project is a pavement rehabilitation project within the Town and Village of New Hartford. Project limits are along Genesee Street (NYS Route 921E) from the intersection with NYS Route 12 to the village line, and, along Campion Road, Oxford Road, and Mill Street (NYS Route 921T) from the New Hartford Shopping Center driveway to the connection with NYS Route 8 Southbound. This 1.7-mile pavement rehabilitation project will be completed using a 2 inch micromill with a 2 inch overlay. Traffic signals and pedestrian facilities within the project limits will be improved. Roadside safety elements will be addressed including guiderail, drainage, and signs. The objective of this project is to improve the pavement ride quality and safety of the roadway.Rehabilitation · Contract D264929 · Planned completion Oct 10, 2025
Source: NYSDOT Capital Program projects; Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Nov 1, 2026.
Structures named 0 found in the structure layers
No structures.
Source: NYSDOT Bridges; NYSDOT Large Culverts. Our copy checked Nov 1, 2026. From the BINs in the index row and in program titles. Verify which drawings apply to your structure.