Projects
The Statewide Transportation Improvement Program: 2,489 entries by PIN, with Capital Program details on each project's page.
- PIN 881584STIPCULVERT REPLACEMENTS ON ROUTE 44: ULSTER COUNTYProgrammed FFY 2026 $5.8M · Ulster
- PIN 881586STIPCULVERT REPLACEMENTS - RT 301 & RT 22 & RT 123Programmed FFY 2026 $900k, FFY 2027 $6.2M · Putnam
- PIN 881592STIPROUTE 9 OVER STOCKPORT CREEK BRIDGE REPLACEMENT: COLUMBIAProgrammed FFY 2026 $1.1M, FFY 2027 $1.1M, FFY 2028 $48M · Columbia
- PIN 881593STIPBRIDGE WASHING/DECK SEALINGProgrammed FFY 2026 $3.0M · Columbia
- PIN 881594STIPBRIDGE WASHING/DECK SEALINGProgrammed FFY 2026 $50k, FFY 2027 $3.0M · Columbia
- PIN 881595STIPBRIDGE WASHING/DECK SEALINGProgrammed FFY 2027 $50k, FFY 2028 $3.0M · Columbia
- PIN 881596STIPBRIDGE PAINTING - COLUMBIA, ORANGE & PUTNAMProgrammed FFY 2026 $5.8M · Columbia
- PIN 881597STIPBRIDGE PAINTING - ORANGE, ROCKLAND, ULSTER, & WESTCHESTERProgrammed FFY 2026 $6.5M · Orange
- PIN 881598STIPBRIDGE PAINTINGProgrammed FFY 2027 $150k, FFY 2028 $5.8M · Columbia
- PIN 881613STIPLANDSCAPE IMPROVEMENTS AND POLLINATOR ENHANCEMENTS CONTRACTProgrammed FFY 2026 $80k, FFY 2027 $1.1M · Columbia
- PIN 881614STIPLANDSCAPE IMPROVEMENTS AND POLLINATOR ENHANCEMENTS CONTRACTProgrammed FFY 2028 $80k, FFY 2029 $1.1M · Columbia
- PIN 881616STIPSTORMWATER MANAGEMENT MBCProgrammed FFY 2026 $250k, FFY 2027 $1.8M · Columbia
- PIN 881619STIPOVERHEAD SIGN STRUCTURE REPLACEMENTSProgrammed FFY 2026 $400k, FFY 2027 $150k, FFY 2028 $4.8M · Westchester
- PIN 881620STIPSLOPE EROSION REPAIR AND PREVENTION: ROUTES 212 AND 214Programmed FFY 2027 $600k, FFY 2028 $18M · Ulster
- PIN 881626STIPSIGNAL OPTIMIZATION: WIRELESS VEHICLE DETECTION SYSTEMProgrammed FFY 2026 $1.1M · Dutchess
- PIN 881627STIPSIGNAL OPTIMIZATION: WIRELESS VEHICLE DETECTION SYSTEMProgrammed FFY 2026 $50k, FFY 2027 $1.1M · Columbia
- PIN 881633STIPROUTES 118 AND 129 WALL REPAIR & SLOPE STABILIZATIONProgrammed FFY 2026 $514k, FFY 2027 $5.8M · Westchester
- PIN 881640STIPCULVERT PREVENTIVE MAINTENANCEProgrammed FFY 2026 $120k, FFY 2027 $270k, FFY 2029 $2.3M · Columbia
- PIN 881646STIPSIGNAL IMPROVEMENTS: DUTCHESS, ORANGE, AND ROCKLANDProgrammed FFY 2026 $800k, FFY 2027 $9.4M · Dutchess
- PIN 881648STIPBRIDGE DECK/SUPERSTRUCTURE REPLACEMENTS: BART BULL & BEEKMAProgrammed FFY 2026 $20M · Dutchess
- PIN 881655STIPHRP SB EXIT 5B RAMP TO E. 3RD STREET: FLOOD MITIGATIONProgrammed FFY 2026 $392k, FFY 2027 $4.6M · Westchester
- PIN 881665STIPBIENNIAL SIGN CONTRACTProgrammed FFY 2029 $300k · Columbia
- PIN 881668STIPSIGNAL IMPROVEMENTSProgrammed FFY 2026 $200k, FFY 2027 $100k, FFY 2028 $400k, FFY 2029 $2.4M · Columbia
- PIN 881669STIPSIGNAL IMPROVEMENTSProgrammed FFY 2027 $200k, FFY 2028 $100k, FFY 2029 $400k · Columbia
- PIN 881670STIPSIGNAL UPGRADESProgrammed FFY 2027 $120k, FFY 2028 $1.1M · Columbia
1,826–1,850 of 2,489
Source: Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Nov 3, 2026. Programmed amounts are plans, not awards. Download these as CSV