Projects

The Statewide Transportation Improvement Program: 2,489 entries by PIN, with Capital Program details on each project's page.

  • CULVERT REPLACEMENTS ON ROUTE 44: ULSTER COUNTY
    Programmed FFY 2026 $5.8M · Ulster
  • CULVERT REPLACEMENTS - RT 301 & RT 22 & RT 123
    Programmed FFY 2026 $900k, FFY 2027 $6.2M · Putnam
  • ROUTE 9 OVER STOCKPORT CREEK BRIDGE REPLACEMENT: COLUMBIA
    Programmed FFY 2026 $1.1M, FFY 2027 $1.1M, FFY 2028 $48M · Columbia
  • BRIDGE WASHING/DECK SEALING
    Programmed FFY 2026 $3.0M · Columbia
  • BRIDGE WASHING/DECK SEALING
    Programmed FFY 2026 $50k, FFY 2027 $3.0M · Columbia
  • BRIDGE WASHING/DECK SEALING
    Programmed FFY 2027 $50k, FFY 2028 $3.0M · Columbia
  • BRIDGE PAINTING - COLUMBIA, ORANGE & PUTNAM
    Programmed FFY 2026 $5.8M · Columbia
  • BRIDGE PAINTING - ORANGE, ROCKLAND, ULSTER, & WESTCHESTER
    Programmed FFY 2026 $6.5M · Orange
  • BRIDGE PAINTING
    Programmed FFY 2027 $150k, FFY 2028 $5.8M · Columbia
  • LANDSCAPE IMPROVEMENTS AND POLLINATOR ENHANCEMENTS CONTRACT
    Programmed FFY 2026 $80k, FFY 2027 $1.1M · Columbia
  • LANDSCAPE IMPROVEMENTS AND POLLINATOR ENHANCEMENTS CONTRACT
    Programmed FFY 2028 $80k, FFY 2029 $1.1M · Columbia
  • STORMWATER MANAGEMENT MBC
    Programmed FFY 2026 $250k, FFY 2027 $1.8M · Columbia
  • OVERHEAD SIGN STRUCTURE REPLACEMENTS
    Programmed FFY 2026 $400k, FFY 2027 $150k, FFY 2028 $4.8M · Westchester
  • SLOPE EROSION REPAIR AND PREVENTION: ROUTES 212 AND 214
    Programmed FFY 2027 $600k, FFY 2028 $18M · Ulster
  • SIGNAL OPTIMIZATION: WIRELESS VEHICLE DETECTION SYSTEM
    Programmed FFY 2026 $1.1M · Dutchess
  • SIGNAL OPTIMIZATION: WIRELESS VEHICLE DETECTION SYSTEM
    Programmed FFY 2026 $50k, FFY 2027 $1.1M · Columbia
  • ROUTES 118 AND 129 WALL REPAIR & SLOPE STABILIZATION
    Programmed FFY 2026 $514k, FFY 2027 $5.8M · Westchester
  • CULVERT PREVENTIVE MAINTENANCE
    Programmed FFY 2026 $120k, FFY 2027 $270k, FFY 2029 $2.3M · Columbia
  • SIGNAL IMPROVEMENTS: DUTCHESS, ORANGE, AND ROCKLAND
    Programmed FFY 2026 $800k, FFY 2027 $9.4M · Dutchess
  • BRIDGE DECK/SUPERSTRUCTURE REPLACEMENTS: BART BULL & BEEKMA
    Programmed FFY 2026 $20M · Dutchess
  • HRP SB EXIT 5B RAMP TO E. 3RD STREET: FLOOD MITIGATION
    Programmed FFY 2026 $392k, FFY 2027 $4.6M · Westchester
  • BIENNIAL SIGN CONTRACT
    Programmed FFY 2029 $300k · Columbia
  • SIGNAL IMPROVEMENTS
    Programmed FFY 2026 $200k, FFY 2027 $100k, FFY 2028 $400k, FFY 2029 $2.4M · Columbia
  • SIGNAL IMPROVEMENTS
    Programmed FFY 2027 $200k, FFY 2028 $100k, FFY 2029 $400k · Columbia
  • SIGNAL UPGRADES
    Programmed FFY 2027 $120k, FFY 2028 $1.1M · Columbia
1,826–1,850 of 2,489
Source: Statewide Transportation Improvement Program (STIP), updated Jun 23, 2026. Our copy checked Nov 3, 2026. Programmed amounts are plans, not awards. Download these as CSV